About the project

  • Client: Low Whiteside
  • Category:
- Enercon E33 – 330kW
- 37 metre hub height
- Estimated annual output – 750,000kWh
- Project size - <£1m

This project required a 3 km grid connection cable to be installed in collaboration with a number of neighbouring wind turbines and by agreement with South Lanarkshire Council. The turbine now produces more than 750,000kWh of clean energy every year - offsetting over 300,000kg of CO2 per annum.